FlowCV Logo
Profile

Has Fifteen years of experience in the field of Civil Engineering, and Project Management in Qatar and Egypt.

Professional in Civil and Infrastructure works (specialized in building works and Infrastructure such as Supervision and inspection of the project execution which included Monitoring the Execution of all construction activities of the projects along with Finishing Items.

PMI® MEMBER

Member ID: 8571367

Education
Bachelor of Civil Engineering, Assuit University
2002 – 2007 | Assuit, Egypt

A Bachelor of Civil Engineering (BSCE) is intended to provide graduates with the skills and knowledge needed to design, build, and operate engineered systems such as roads, infrastructures, buildings, bridges, airports, and water supply and wastewater treatment systems.

Courses
Projects Management Professional, YALLAPMP
2022 – 2023 | NACR CITY, Egypt

I have received the project management professional course from (YallaPmp) an accredited academy from Project Management Institute PMI.

This course will support my management skills and develop my project management and integration skills.

Projects
Construction Manager
2014 – 2022

Ikramy RashwanConstruction Manager
resume profile picture
Email
[email protected]
Phone
+97466951100
Location
Doha,Qatar
29 Apr 1985
Egypt
Marital status
Married
Qatar license
Male
LinkedIn
Ikramy Rashwan
Skills
Problem-solving

The ability to identify a problem and find a proper solution through analysis of the problem causes

Communication

ability to quickly convey ideas to your coworkers, and Proper communication can help you solve problems that affect multiple teams within the company since it expedites the process of identifying an issue, finding a solution, and implementing it.

Teamwork

Ensuring the cooperation with teammates to succeed as a unit and perform to your highest combined ability.

Leadership

Working in close conjunction with the construction team to ensure all plans were followed and executed satisfactorily.

Motivate and support the teamwork during all project phases.

  • Civil Work for utilities in Lusail Palace of H.H Sheikh Tamim
  • Hamad al Thani

    Sub Cont. under UCC 12 million. (Project Manager) (Project Manager)

  • Construction of Compound consists of 80 - Villas’ (G+1+PH) + 2 Clubs + Administration Bldg. + 2 Swimming pools + Masjid) at Al
  • Gharrafa 62 million.

  • “Design and Build – Red Line North Underground Metro Doha” Permanent All Utilities Networks & Connections in Various Stations (10 nos) Under ISG joint venture 18 million. (Project Manager)
  • “Red Line South Elevated & At Grade” Utility Diversion Works for Underpass Area
  • “Red Line South Elevated & At Grade” Third Party Telecom Works for RBF & Al Wakra Station & Hard Scaping Works RBF Station(Project Manager)
  • “Design and Build – Red Line North Underground Metro Doha” Potable Water Connection from Kahramaa Connection Points to Station
  • Construction of Classroom buildings (G+2)& Services to Noor Al Khaleej School including renovation of some existing areas (full contract) at Al Hilal-Qatar for Public Works Authority –Building Affairs 9 million.
  • G+3 Labor accommodation at Muaizar Umm Alzubar for Doha International Co. (DIC) employees. 4.60 million.

  • 2B+G+7 Residential Building at Bin Mahmoud for Shk. Thani Bin Khalifa 54 million.
  • Construction of 2 – Villas (G+1+PH) at Duhail-Qatar for Mahmoud Al Mahmoud 8 million
  • Project Engineer
    2007 – 2014
  • Construction of B+G+7 building at Muntazah- Qatar 24 million.
  • Maintenance of 3-Building (B+G+5) at Umm Guilina- Qatar 34 million.
  • Languages
    Arabic

    Mother Tongue

    English

    Good

    Work Experience
    Construction Manager
    2014 – 2022 | Doha, Qatar

     Monitor Project Progress and Set Deadlines.

     Achieve integration between projects team

     Anchoring On-Site Construction activities as per the given drawings to ensure completion of the project within the time & cost parameters and effective resource utilization to maximize the output.

     Inspecting Field Sites to observe and evaluate the condition and operability of facilities and structures, and to collect field survey data and measurements.

     Identifying Resource needs & timely deployment of resources, identifying resources under/over-allocated areas, monitoring & control resource utilization and productivity, to ensure smooth execution of projects.

     Preparing cost estimates for various projects to be executed and controlling the project’s cost.

     Team Management

     Coordinating manpower planning and planning for competency building for the implementation of new projects.

     Responsible for team building and providing effective leadership to realize every team member's potential for quantifiable results.

    Project Engineer
    2007 – 2014 | Doha, Qatar

     Manages day-to-day operational aspects of a project and scope.

  • Construction of 7- villas (G+1+PH) + out kitchens (full contract) at Doha for Mubarak almatwi 7 million.
  • Construction of 1 -Villa (B+G+1+PH) + out kitchens (full contract) at Dafna-Qatar for dr ali qurah daghi 3 million.
  • Construction of B+G+7 Building = (84 flats at Al Jazeera Street, Bin Mahmoud- Qatar UC consultant 26 million
  • Construction of (B+G+3) building at Bin Omran Qatar for Mohd alsulaity 12 million
  • Construction of (B+G+7) (24 flat) finishing work behind La Cigale at Bin Mahmud- Qatar
  • Construction of 8 - Villas’ (G+1+PH) + out kitchens (full contract) at Al Khesa for Mahmoud al Mahmoud 16 million.
  • Construction of Garage al Rayyan Municipality at Gharafa-Qatar 6 million.
  • Foul Sewer 45 house connections lines & manholes from public work Authority in DOHA, RAYYAN & WAKRA
  • “Red Line South Elevated & At Grade” Foul Sewer pipe lines network at RBF Metro Station
  • “Red Line South Elevated & At Grade” Third Party Telecom Works for RBF & Al Wakra Station & Hard Scaping Works RBF Station
  • “Design and Build – Red Line North Underground Metro Doha” Sewer Diversion Works for Corniche Station Underpasses (formerly Al Bida)
  • Project Manager, Public Work Authority
    2022 – 2023

    Structural renovation for 14 schools in different locations in the State of Qatar - Design and Built

    Client: Public Work Authority (ASHGHAL)

    48 million.

    Interests
    Travelling, Reading and Searching, Sports

     Effectively applies our methodology and enforces project standards.

     Ensure that all testing equipment shall be available and equipment shall be valid, and calibrated.

     Directing the assigned Materials Quality Control Engineer to perform sampling for soils and aggregates, steel bars, and cement for submission to the Regional Materials Testing Laboratory in preparation for the formulation of concrete design mix.

     Supervision and inspection including the setting out, excavations for foundations, placing of reinforcements for all major and minor structures, formworks, and pouring of concrete to ensure that all works comply with the Standard Specifications

     Preparing manpower scheduling and utilization of equipment to ensure maximum efficiency

     Preparing monthly and weekly reports

    Prepares for engagement reviews and quality

     assurance procedures.

     Ensures project documents are complete, current, and stored appropriately.

     Effectively utilizes each team member to his fullest potential.

     Followed up on health and safety environments (HSE) regulations.

     Motivates team to work together in the most efficient manner.

     Supervision and inspection of the project execution including surveying, excavation, backfilling, asphalt, etc.